1 on 1 power train configuration
1 Gas turbine, 1 Steam turbine, 1 HRSG
2 x GSUT
1 x 115 kV / 23 kV transformer
1 x 115 kV/ 6.9 kV Aux transformer
2 x 6.9 kV/ 400V Aux transformer
Demin + RO water treatment
Commercial Operation Date on 4th February, 1999
Steam delivery: 20 ton/ hr, 1.3 barg superheated steam to an Industrial User
GE MS6001FA w/ DLN2.6 combustion NG fired OpFlex Auto Tune, speed 5,200 rpm, Output 64.0 MW
GE 7A6 Air cooled generator, Output 83.6 MVA, Armature volts 11.5 kV, 50 Hz, 2 Poles, 3 phase , Speed 3000 rpm